파일:ETCS Modes during Cab Change.svg

L위키, 시민들이 참여하여 가꾸는 리버럴 위키

원본 파일(SVG 파일, 실제 크기 1,760 × 1,360 픽셀, 파일 크기: 77 KB)

이 파일은 공용 저장소에 있으며, 다른 프로젝트에서 사용하고 있을 가능성이 있습니다. 해당 파일에 대한 설명이 아래에 나와 있습니다.

파일 설명

설명
Deutsch: Fahrtrichtungswechsel eines Zuges (drei Zugteile, sechs Fahrzeuggeräte) unter ETCS Level 2:
  • Schritt 1: Zunächst überwacht ETCS, in der Betriebsart (Modus) "Stand-by" (SB), den Fahrzeugstillstand. Es ist kein Führerstand geöffnet (aktiv).
  • Schritt 2: Der Führerstand A am Zugteil 1 (links) wird aktiviert (geöffnet), dabei werden Zugdaten eingegeben. Das Fahrzeuggerät (EVC) wechselt dabei in den Modus "Stand-by" (SB), die übrigen Fahrzeuggeräte gehen in der Betriebsart "Sleeping" (SL). Auf der folgenden Fahrt lesen diese Fahrzeuggeräte Ortungsinformationen der Balisen mit.
  • Schritt 3: Mit gültigen Zugdaten wird nun im Rahmen der Aktivierung (Start of Mission) ein Level ausgewählt. Nach Auswahl von Level 2 kann in der Regel eine (GSM-R-)Verbindung zur ETCS-Zentrale (RBC) aufgebaut werden. Wurde zuvor (in der Betriebsart Sleeping) eine gültige Positionsinformation eingelesen, kann noch im Stillstand eine Fahrterlaubnis (MA) angefragt werden.
  • Schritt 4: Nach dem Schließen (Deakitivieren) des Führerstands A im Zugteil 1 sind alle Fahrzeuggeräte (EVC) in der Betriebsart Stand-by. Es erfolgt im Wesentlichen nur noch eine Wegrollüberwachung.
  • Schritt 5: Durch die Aktivierung (Öffnung) des Führerstands B im Zugteil 3 wechselt nunmehr das zugehörige Fahrtzeuggerät in die Betriebsart "Stand-by" (siehe Schritt 2).
  • Schritt 6: Auf dem Führerstand B im Zugteil 3 erfolgt die Auswahl des ETCS-Levels. Nach Auswahl von Level 2 kann in der Regel eine Verbindung zur ETCS-Zentrale aufgebaut und unter Umständen eine Positionsinformation eingelesen und eine Fahrterlaubbnis anfordert werden (siehe Schritt 3).
English: Change of directions under ETCS Level 2 (with three train units, six European Vital Computers):
  • Step 1: In "Stand-by" mode (SB) the six ETCS on-board computers (EVCs) supervise train stand-still.
  • Step 2: After opening cab A in section 1 and train data has been entered, all other EVCs of the train will switch to "Sleeping" mode (SL). The remaining cabs switch to "Sleeping" (SL) where they will read location balise and other information during the journey ahead.
  • Step 3: After entering valid train data during Start of Mission (SoM), a (GSM-R) connection to the RBC will usually be established, a Movement Authority (MA) might be retrieved.
  • Step 4: With the closing of the leading cab A in section 1, all other EVCs go to SL mode, supervising stand-still (see step 1).
  • Step 5: With the acitivation of cab B in section 3, its EVC switches to SB mode, the others EVCs remain in SL mode (see step 2).
  • Step 6: After selecting ETCS Level 2, usually a connection to the RBC might be established and a, using previous position information (if available), a Movement Authority (MA) might be requested (see step 3).
날짜
출처 Provided by the author under CC-BY (see lower right of image)
저자 Florian Caspar

라이선스

w:ko:크리에이티브 커먼즈
저작자표시
이 파일은 크리에이티브 커먼즈 저작자표시 4.0 국제 라이선스로 배포됩니다.
이용자는 다음의 권리를 갖습니다:
  • 공유 및 이용 – 저작물의 복제, 배포, 전시, 공연 및 공중송신
  • 재창작 – 저작물의 개작, 수정, 2차적저작물 창작
다음과 같은 조건을 따라야 합니다:
  • 저작자표시 – 적절한 저작자 표시를 제공하고, 라이센스에 대한 링크를 제공하고, 변경사항이 있는지를 표시해야 합니다. 당신은 합리적인 방식으로 표시할 수 있지만, 어떤 방식으로든 사용권 허가자가 당신 또는 당신의 사용을 지지하는 방식으로 표시할 수 없습니다.

설명

이 파일이 나타내는 바에 대한 한 줄 설명을 추가합니다

이 파일에 묘사된 항목

다음을 묘사함

파일 역사

날짜/시간 링크를 클릭하면 해당 시간의 파일을 볼 수 있습니다.

날짜/시간섬네일크기사용자설명
현재2016년 5월 9일 (월) 15:552016년 5월 9일 (월) 15:55 판의 섬네일1,760 × 1,360 (77 KB)commonswiki>Bigbug21User created page with UploadWizard

다음 문서 1개가 이 파일을 사용하고 있습니다:

메타데이터